BR3: Unterschied zwischen den Versionen
Zur Navigation springen
Zur Suche springen
Apaul (Diskussion | Beiträge) |
Apaul (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
| Zeile 7: | Zeile 7: | ||
{| | {| | ||
| style="vertical-align:top; width:40em"| | | style="vertical-align:top; width:40em"| | ||
*VenCube | *Place VenCube as close as possible to the machine controls and the payment systems. | ||
* | *Glue or screw the base plate in the machine. If the base plate is glued, please press the base plate firmly without Vencube. | ||
* | * De-energize the machine and disconnect all existing payment systems from the machine control. | ||
*MDB | *Connect the VenCube's MDB master connection to the controller. | ||
*MDB | *Connect MDB slave connection to all existing payment systems. Y-cables should be used for additional MDB slave connections. | ||
* | *Install door switch. | ||
{{Vorlage:Hinweis vorhandener Türschalter}} | {{Vorlage:Hinweis vorhandener Türschalter}} | ||
{{Vorlage:Hinweis Türschalter als Schließer}} | {{Vorlage:Hinweis Türschalter als Schließer}} | ||
Version vom 17. Januar 2022, 14:41 Uhr
installation instructions
| File | User manual Vencube beta currently only in German |
|---|---|
| Download link | BA_Vencube_beta_032020.pdf |
Vencube assembly and commissioning
Mount the Vencube
Vencube Commissioning
- Turn on the machine.
- If necessary, adjust the Vencube using the Ventool.
- If necessary, configure the machine control and the payment systems.
You can find information on this in the wiki! - Wait until both LEDs turn green.
- Close the door.
- Test the machine by making a trial vend with change.
- Open the door again.
- Enter the data for VENSOFT (serial number, machine number).
- Perform a cash withdrawal by pressing the “E” button on the Vencube until you hear a beep.
- Close the door.
- Commissioning is complete.
|
|
|





