Installation instructions

File User manual Vencube beta currently only in German
Download link BA_Vencube_beta_032020.pdf

Vencube assembly and commissioning

Mount the Vencube

The device is assembled by the customer.
Proceed as follows during assembly:

  • Open the machine.
  • Turn off the power to the machine.
  • Determine the optimal installation position:
    Place the VENCUBE as close as possible to the machine controls and payment systems.
    Make sure that the controls are easily accessible.
    Note the cable length.
  • Glue the base plate (holder) and screw it. (Image 1)

If gluing is not possible, the assembly click holder must be screwed diagonally to the designated points in the machine with at least 2 screws1). The screw heads must be complete Sit flush and must not protrude.
1) Hardened countersunk self-drilling screw, ∅ 3.5 according to DIN 7504

  • Clip the VENCUBE into the base plate. (Image 2)
  • Remove the machine controls cover.

The machine must be voltage-free!

  • Disconnect all existing payment systems (1, 2) from the machine control. (Image 3)
  • Connect the cables from the VENCUBE:
  • Connect the (MDB) master connection (3) from the VENCUBE to the vending machine control. (Image 4)
  • Connect the (MDB) slave port (4) to all existing payment systems (5). If necessary, use a Y-cable. (Image 5)
  • If possible, glue the antenna (6) behind a plastic cover. (Image 6)
  • Route the antenna cable.
  • Lay all cables professionally with cable ties.

Never use the existing door switch of the machine, this can destroy the Vencube.

Always connect the door switch as closer to plug 1 with the Vencube.
Use connector "COM" and connector "NO" from the switch.

Image 1
Image 3
Image 5
Image 2
Image 4
Image 6

Vencube Commissioning

  • Turn on the machine.
  • If necessary, adjust the Vencube using the Ventool.
  • If necessary, configure the machine control and the payment systems.
    You can find information on this in the wiki!
  • Wait until both LEDs turn green.
  • Close the door.
  • Test the machine by making a trial vend with change.
  • Open the door again.
  • Enter the data for VENSOFT (serial number, machine number).
  • Perform a cash withdrawal by pressing the “E” button on the Vencube until you hear a beep.
  • Close the door.
  • Commissioning is complete.


  • Place Vencube as close as possible to the vending machine control and payment systems.
  • Glue or screw the base plate into the machine. If the base plate is glued, please press it firmly into place without the Vencube.
  • Power down the machine and disconnect all existing payment systems from the vending machine control.
  • Connect the MDB master port from the VenCube to the vending machine control.
  • Connect the MDB slave port to all existing payment systems. Y-cables should be used for additional MDB slave connections.
  • Install door switch.

Never use the existing door switch of the machine, this can destroy the Vencube.

Always connect the door switch as closer to plug 1 with the Vencube.
Use connector "COM" and connector "NO" from the switch.

Installation instructions for the door switch:

  • When the machine is closed, the door switch should only have 1-2 mm of play.
  • Insert the screws so that they are centered in the oval hole. So it is possible to adjust the switch forwards and backwards.
  • The door switch must not switch without play!
Vendo machine SVE EV8
Door switch holder from above
Door switch holder on the side
Door switch holder counter plate

Software version of the VMC

Machine control settings